Full Bathroom & Multi-Area Property Renovation

Back to All Projects

Before
Before
Before
Before
Before
Before
Before
After
After
After

This project was a comprehensive refurbishment covering a full upstairs bathroom renovation alongside improvement works in the kitchen, hallway, and downstairs WC/shower room. The project involved coordinated plumbing, tiling, electrical adjustments, ventilation, carpentry, and finishing works. Works were delivered under a fixed quotation, with additional daily-rate remedial works agreed separately.

Work Summary

Upstairs Bathroom Works

  • Full wall and floor tiling

  • Ceiling cladding installation

  • Installation of 6 fire-rated spotlights

  • Relocation of light switch and electric shower isolator

  • Installation of new electric shower and extractor fan

  • Sink relocation and plumbing adjustment

  • Radiator replacement

  • Installation of new steel bath, sink, toilet, and bidet spray

  • Damp-proofing to bath-side wall

  • Removal and replacement of door and frame

Kitchen

  • LED spotlight inspection and repair

Hallway

  • Removal of existing door and frame

  • Installation of new door and frame

  • Blocking and finishing of internal light window

Downstairs WC / Shower Room

  • Standing shower enclosure installation

  • Hot & cold mixer shower installation

  • Waste pipe investigation (odour issue during heavy rain)

  • Ceiling cladding installation

  • Door adjustment and new lock installation

  • Installation of bidet spray

Additional Works (Daily Rate)

  • Electrical repairs to kitchen, living room, hallway, porch, and upstairs switches

  • Socket replacements and fault investigation

  • External lighting installation (front and rear garden)

  • Guttering inspection and minor works

Challenges & Resolution

  • Electrical reconfiguration required safe rerouting of switches and isolators to comply with bathroom zoning regulations.

  • Ventilation and damp concerns were addressed through extractor installation and damp-proof treatment.

  • Complex bathroom layout adjustments were managed without structural compromise, maintaining compliance and usability.

  • Works were carefully phased to minimise disruption while accommodating additional client requests under a daily rate.

Compliance & Regulations

  • BS 7671:2018 IET Wiring Regulations

  • Building Regulations Part P Electrical Safety

  • Water Supply (Water Fittings) Regulations 1999

  • Health & Safety at Work Act 1974

Client Feedback

“Very thorough work across the whole property. Clayton handled a complex bathroom renovation and additional electrical works professionally and kept communication clear throughout.”

Project Type:

Full Bathroom & Multi-Area Property Renovation

Location:

Nottingham, United Kingdom

Client:

Habeeb (Private Homeowner)